GedlerSmall electric hydraulic elevatorMarket news

announcer:hp935HP175192871 release time:2024-09-07 13:18:29

GedlerWarehouse electric elevator,

The counterweight guide rail should meet the specification requirements.

Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.

Gedler.When a suspension cage with a rated load capacity acts on the buffer at a speed greater than the rated speed of 0.2m/s, the average deceleration of the suspension cage should not exceed 1g, and the time when the peak deceleration exceeds 5g should not exceed

Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

.To meet the needs of choreographers and choreographers in different plays different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea, using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.


GedlerSmall electric hydraulic elevatorMarket news



Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door

When using lifting equipment, the workbench should be kept in a horizontal state.

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

How much does it cost?.The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.


GedlerSmall electric hydraulic elevatorMarket news



Horizontal lead screw mechanical electricity

system.Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.

Items and other miscellaneous items.

Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, when there is a major malfunction of the lifting platform,GedlerFlagpole electric elevator, it should be repaired by professional personnel as soon as possible. After the malfunction occurs,GedlerElectric passenger lift, it should not be used again to avoid accidents, personnel and property losses.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts it is advisable to place the screw at the bottom and the nut at the top.