cork6-12 meter fully automatic elevatorManufacturing process analysis

announcer:hp935HP175192871 release time:2024-08-27 11:57:30

hydraulic control one-way valve and the return oil from the lower end of the hydraulic cylinder passes through the balance valve,corkElevator electric micro, energy-saving valve, and explosion-proof electric valve

The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

.Before installation the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.


cork6-12 meter fully automatic elevatorManufacturing process analysis



During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.

And the decoration team is also using aluminum alloy electric elevators. What safety considerations should we consider during the use process? Many manufacturers have not clearly indicated it. Today, the mechanical editor will talk to you about aluminum alloys

The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.

retailer.When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.


cork6-12 meter fully automatic elevatorManufacturing process analysis



The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve,corkElectric scissor type lifting platform, hydraulic control one-way valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.

Product survey.During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.

Degrees,corkElectric hoist, m/s.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

cork.The quality of the standard section should comply with the product manual and specification requirements.

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Acceptance: Concrete strength grade C30, strength testing report.