ShanghaiLifting and lowering of boarding bridgeWell-known manufacturers

announcer:hp161HP196399230 release time:2024-08-26 15:26:50

Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.

conduct.

Shanghai.There are the following: (1) The brake of the elevator should be regularly inspected to see if its clearance is appropriate, as well as some other aspects, on the friction surface of the brake, it is necessary to check for any dirt, and if any, it should be cleaned in a timely manner. (2) For the part of the moving boarding bridge, it should be carried out in accordance with the specified requirements, and it should be comprehensive and sufficient without any omissions. However, the amount of oil should not be too much, as too much can also cause problems.

Open planning before placement makes it easy to clean up clutter.

.The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, strengthen dynamic management of equipment faults, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.

When confirming that the lip is fixed to the container, pull out the hook to hook it into the container, tighten the chain to ensure that it does not loosen, and press the brake blocks on both sides. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed,ShanghaiMovable boarding bridge, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.


ShanghaiLifting and lowering of boarding bridgeWell-known manufacturers



The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm,ShanghaiMobile hydraulic boarding bridge, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is 20% higher than the market value! More than one ton is more expensive!

Check the rollers, intermediate shafts, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings. Professional axle manufacturers and other special products, 20 year old brand,ShanghaiAutomatic boarding bridge, with price advantages and guaranteed quality

Operation degree: There are two types of operations that can be used to raise and lower the boarding bridge. One is a manual pump station, which uses manual hydraulic lifting, which is labor-intensive and somewhat labor-intensive. Advantages: It can be operated and used in any situation. Two types of electric pump stations use electric hydraulic lifting and lowering which reduces labor intensity and saves labor. Disadvantage: Once the power is cut off, it will not be able to be used, but now there are both manual and electric boarding bridges that are more convenient to use.

technical service.Open planning before placement makes it easy to clean up clutter.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

  1. Before use, check the boarding bridge for obvious damage such as cracks and broken wires.


ShanghaiLifting and lowering of boarding bridgeWell-known manufacturers



What are the issues to pay attention to when using the boarding bridge? For example, mobile boarding bridges are generally used outdoors, and after use, they are also placed outdoors. They are often exposed to wind, rain, and sunlight, the maintenance of the boarding bridge is very important. When it rains, cover the boarding bridge with a rain cloth to prevent rusting and aging.

manufacturer.For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

(5) Each mechanism in the elevator should be checked for normal operation and any noise or other malfunctions. If any, they should be promptly addressed and resolved. All wires and cables in the mobile boarding bridge should be checked for any damage or damage and if any, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.

Slowly reverse and park the container under the lip at the front of the boarding bridge.

Hydraulic boarding bridges should strictly adhere to the principle of being overweight, as overloading may cause damage to objects; Working on a lifting platform without protective barriers may cause personnel to fall and cause casualties.