When the foundation is set on the roof or floor structure,SolingenElevator electric elevator, the bearing capacity of its supporting structure should be checked.

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

Solingen.How to determine the sufficient amount of clean oil for the hydraulic station of an electric elevator? Why cannot water be used to flush the hydraulic station of an electric elevator?

Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts,SolingenElectric tatami elevator, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form concealed engineering acceptance form, and concrete strength report.

.Every theater is a public place with a large number of people, and safety considerations should be taken into account in stage design. According to relevant national regulations, in order to prevent accidents caused by the crushing of electric elevators or improper control by drivers. Electric elevators should be equipped with the following necessary safety devices to ensure that the car of the electric elevator stops rising or falling in a timely manner.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.


SolingenElevator manufacturer



Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

8m; When the lifting speed is greater than 0.8m/s, after the upper limit switch is triggered by the hanging cage, the upper small safety distance L should meet the following requirements: L=8+0.1V2, where L is the upper safety distance; V: Increase speed

When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, but safety should be maintained.

Interpretation and observation.Installation and dismantling personnel and drivers should hold certificates to work.

During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, the rotary valve will automatically open. To close the plug valve, and then turn the transmission handwheel to lower the plug and achieve sealing.


SolingenElevator manufacturer



Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

Direct material.The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

The water cooling of hydraulic stations is generally tubular water cooling. The selection is based on the heat load to calculate the heat exchange area, while the air-cooled electric elevator uses an air cooler to calculate the heat exchange capacity based on the heat load. Then, the selection calculation is carried out under the condition of satisfying the flow rate. So, these two types of cooling are different and have significant differences.

Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.

Solingen.The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.

From the above comparison, it can be seen that hydraulic electric lifting mechanisms have stable lifting, long service life, large load bearing capacity, and are relatively simple, making them suitable for use in stage equipment.

Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends it can automatically cut off the oil circuit and stop descent