Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings,Wright KennyBackground axis electric elevator, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process,Wright KennyMobile electric elevator, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint remove the oil filter, clean it with compressed air,Wright KennyElectric basket elevator, and then return it to the oil tank and connect the pipeline.

With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.

Wright Kenny.The pressure joint between the pipe joint and the rubber hose fails prematurely, causing oil leakage or pipe explosion. The oil temperature rises due to frequent action of the overflow valve.

Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

.Setting requirements: The landing door should be standardized and tooled.

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

It is reported that a fixed electric elevator has good lifting stability and can only be used for fixed operations, making high-altitude operations easier


Wright KennyBasement electric elevatorProfessional custom



Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

The top of the hanging cage is accessible; d) During installation/disassembly/maintenance/inspection of the device; e) Inside the hanging cage.

The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.

Direct material.The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.


Wright KennyBasement electric elevatorProfessional custom



Low power consumption: When the hydraulic guide rail lifting platform descends it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.

Application process.When the landing door is closed, the full width of the lifting passage opening should be covered.

Check whether the sealing of components such as the oil cylinder, oil pipe, and motor of the aluminum alloy electric elevator is good and whether there is any air leakage.

Implementing multiple shifts of homework should fill in and submit records according to regulations.

Wright Kenny.Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

Installation and dismantling personnel and drivers should hold certificates to work.

The verticality of the guide rail frame should meet the requirements of the specifications.