Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

Riverside.During maintenance or when problems occur the power supply should be cut off in a timely manner. After lifting, the aluminum alloy electric elevator should be firmly fixed before maintenance can be carried out. It is strictly prohibited to operate with defects to avoid accidents.

Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance the protective measures taken should comply with the specification requirements.

.For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.

Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends,Riverside6-meter electric elevator, it can automatically cut off the oil circuit and stop descent

A complete lifting platform accessory can be selected and customized according to different places, venues, and environmental usage conditions. Meet the needs of different users. So why lifting platforms can be used and installed in so many industries and places is because they can achieve multi-purpose, demonstrate multifunctional, meet various different needs, and win market demand. In modern industrial transportation processes, lifting platforms have begun to play an increasingly important role, whether in airports, floors,RiversidePortable electric elevator, workshops and other places that require rapid loading and unloading of goods, they have played a very practical value, It has also brought great contributions to the entire industry and even the entire economic development. However, long-term operation and use of these devices inevitably lead to wear and consumption, and regular maintenance and upkeep are essential. Otherwise, both work efficiency and utilization rate will decrease, and at that time, the gains and losses will outweigh the losses.


RiversideElectric one ton elevatorHow to judge good or bad with eyes



After the electric elevator passes the inspection,RiversideElectric elevator 200kg, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

The detailed reason why water cannot be used to flush the hydraulic station is that doing so will corrode the oil tank in the hydraulic station, and once water is mixed in the hydraulic station, the damage to the hydraulic system is very large. Therefore, it will simply form pipeline corrosion water vaporization, it is necessary to prevent such actions to ensure the normal operation and service life of the hydraulic station.

Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

resources.When the landing door is closed, the full width of the lifting passage opening should be covered.

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.


RiversideElectric one ton elevatorHow to judge good or bad with eyes



Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.

new product.The use of standard section connecting bolts should comply with the user manual and specification requirements.

Do not move after lifting, and do not lift until the four legs are firmly supported.

The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

Riverside.The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer

To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, ensuring the safety of the cast members.

During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.