Chantaburi3000 oil immersed transformerSpecify new economic coordinates

announcer:hp122HP117294921 release time:2024-07-14 13:51:59

ChantaburiOil immersed air-cooled transformer,

Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.

Dry type transformer manufacturer

Chantaburi.Power saving analysis of transformer

Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.

.The oil in the machinery and equipment of the oil storage tank shall generally stand for more than 8h before sampling; it is not necessary to stand when sampling on the running power transformer.

After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

The bearing capacity of each load is different. Generally, while oil transformer has better load working capacity.


Chantaburi3000 oil immersed transformerSpecify new economic coordinates



High voltage fuse of transformer breaks one phase;

If the input of dry-type transformer is an alternating switching power supply,ChantaburiDry type transformer sample, its output voltage is directly proportional to the coil turn ratio of the output input solenoid coil. If a rechargeable battery is used, because it is DC add a circuit in the input power supply circuit to change it into a continuously changing voltage. In that way, the alternating DC current can be obtained at the output end.

Oil leakage at electric welding position

Installation conditions.Noise dispersion of dry-type transformer

Power transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision,ChantaburiHow much is a 250kVA box transformer, It is used to carry out insulation compressive strength test under required current for various electrical products electrical components and insulating raw materials.

Wiring mode of dry-type transformer:


Chantaburi3000 oil immersed transformerSpecify new economic coordinates



What is the important role of power transformer

Welcome to inquire.Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, and then Fushi blue raw materials shall be selected for sealing treatment.

How to maintain dry-type transformer?

The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω, The resistor is generally more than 2000 & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only 1 / 500 of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.

Chantaburi.During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.

Seal oil leakage

The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.