FenyangElectric scissor type lifting platformWhat's the market

announcer:hp935HP175192871 release time:2024-07-05 14:25:58

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver,FenyangFreight elevator electric elevator,FenyangAll electric small elevator, the landing door shall not be opened.

Fenyang.It is strictly prohibited to use travel limit switches as switches to stop operation.

Electric elevators used in various places.

.Protective measures should comply with regulatory requirements.

Installation and dismantling personnel and drivers should hold certificates to work.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.


FenyangElectric scissor type lifting platformWhat



The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

It is strictly prohibited to use travel limit switches as switches to stop operation.

Construction electric elevators outside the lightning protection range

Focus on Development.The net height of the landing door opening should not be less than 8m, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed 35mm, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.

After the electric elevator passes the inspection,FenyangDedicated electric elevator, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.


FenyangElectric scissor type lifting platformWhat



Every theater is a public place with a large number of people, and safety considerations should be taken into account in stage design. According to relevant national regulations, in order to prevent accidents caused by the crushing of electric elevators or improper control by drivers. Electric elevators should be equipped with the following necessary safety devices to ensure that the car of the electric elevator stops rising or falling in a timely manner.

production costs.Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

The cargo is 0.5m.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

Fenyang.Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.