SheilaDry type transformer model scb10The industry's method of picking up leaks

announcer:hp122HP117294921 release time:2024-07-02 09:34:22

The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.

Oil immersed transformer operation

Sheila.Several detection methods for installing transformer

There are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.

.In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.

Power transformer manufacturer

In the case of dry-type transformer operation, there is more noise, which seriously endangers everyone's no problem rest time and work. At this time, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.


SheilaDry type transformer model scb10The industry



Seal oil leakage

How to make up oil for oil immersed transformer?

Power transformer plant

Highly recommended.Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer,SheilaIndoor installation of oil immersed transformer,SheilaGe transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage it shall be handled properly.

Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

For example, in the 1970s, the radio programs applied by every family in the countryside had a ground wire, and they were often wet with tap water. Protective grounding is to bury the copper plate of metal electrical conductor in the soil layer, and then lead a point of it out of the road with transmission line, which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ 4Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances, office and other electrical equipment.


SheilaDry type transformer model scb10The industry



Oil leakage of heat pipe radiator

Click to view.Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.

The grounding resistance of, high voltage and bottom voltage shall not be less than 70% (10m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed 2%, which shall not exceed 2% compared with the last accurate measurement result.

Power transformers are used in all walks of life

Sheila.The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core,SheilaInstallation scheme of 35 kV oil immersed transformer, which is stacked at the 45 degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, and has sound insulation and noise reduction.

What is the wiring mode of dry-type transformer?

Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.