AkbarabadSelection of three-phase dry-type transformerTalking about the Misunderstanding of Type Selection and Use

announcer:hp122HP117294921 release time:2024-07-01 14:03:41

China's energy-saving distribution transformer market is relatively scattered

Seal oil leakage

Common problems of tap changer of power transformer

Akbarabad.Transformer manufacturers said that at this stage, coupled with the constraints of factors such as low threshold in the field, uneven companies, lack of evaluation and specifications, and inadequate technical innovation, resulting in slow marketing of energy-saving transformers.

Seal oil leakage

.Dry type transformer factory

The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance,AkbarabadPower supply high frequency transformer, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.

The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.


AkbarabadSelection of three-phase dry-type transformerTalking about the Misunderstanding of Type Selection and Use



Careless maintenance and insulation damage

Maintenance contents of power transformer

Caused by sand holes and cracks. For crack leakage drilling stop hole is a good way to remove in-situ stress and prevent widening.

supply.When the screw of the through core extruder holding the iron core of the transformer is loose,AkbarabadMulti voltage output transformer, there are screw cap parts left on the iron core, or small metal materials fall into the transformer, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak, squeak & rdquo; It's like a magnet sucking a small washer, while the working voltage, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer, and can be solved until power failure.

The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; 0” Voltage. When the machine and equipment casing is electrified, it will be grounded from the surrounding grounding body.

Pursuit of excellence.(IV) the transformer on the column shall be stable and firm,AkbarabadOil immersed transformer oil storage tank, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

The insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;

(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

Akbarabad.35kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.

From the appearance, the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, and only the shell can be seen for oil immersed transformer;

For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure, damage to machinery and equipment, etc.