RubeElectric mobile hydraulic elevatorProcessing application effect

announcer:hp935HP175192871 release time:2024-06-30 14:40:57

The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.

Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

Rube.The counterweight steel wire rope should be equipped with an anti loosening device that is sensitive and reliable.

The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.

.Use floor doors and cage door devices on construction sites where conditions permit.

Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered down


RubeElectric mobile hydraulic elevatorProcessing application effect



The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

There is a certain itinerary.

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Excellent quality.Emergency manual valve: In case of power failure, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.

Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet,RubeHand push electric elevator,RubeElectric basket elevator, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit,RubeElevator electric 6 meters, and verified by experts.

quality index.The L distance depends on the selected wall mount model.

The counterweight steel wire rope should be equipped with an anti loosening device that is sensitive and reliable.

Especially suitable for steel structured factories suitable for both indoor and outdoor installation.

Rube.Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.