class H dry-type transformers shall be used. If the standard impulse level of power load exceeds 150kV

Power transformer factory

(III) dry type transformers of 315KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than 5m; The distance between the electrified part and the road surface shall not be less than 5m.

Karat.The selection shall be carried out according to the load characteristics of power. There are many types of power loads. Different dry-type transformers shall be used for different power loads. If the standard impulse level of power load is less than 150kV, epoxy resin adhesive shall be used to pour dry-type transformers.

Dry type transformer

.Solenoid insulation deterioration

Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.

According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.


KaratPower transformer modelHow to determine the impeller steering



In the case of dry-type transformer operation, there is more noise,KaratTransformer and box transformer, and some even cause noise, which seriously endangers everyone's no problem rest time and work. At this time, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.

This is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.

Therefore,KaratPrice of 2000kVA dry type transformer, in the operation prevention and regulation of relay protection dry-type transformer, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.

resources.It will also produce many faults, effectively deal with various faults of oil immersed transformer, make full use of the performance indicators and advantages of oil immersed transformer, and continuously improve the safety factor of oil immersed transformer. Ignition is a common fault of oil immersed transformer. The key fault of oil immersed transformer is short-circuit fault, and short-circuit fault is more general.

Gradually, high-frequency vibration damping mechanical equipment such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer,KaratPower supply transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.

Noise dispersion of dry-type transformer


KaratPower transformer modelHow to determine the impeller steering



What is the wavelength of oil immersed transformer?

consumption.The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.

Several detection methods for installing transformer

After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.

Karat.(III) dry type transformers of 315KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than 5m; The distance between the electrified part and the road surface shall not be less than 5m.

The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.

The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.