For 630kVA power engineering transformer,KwaraoulState Grid transformer won the bid, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

Brief introduction of zero line of power transformer

Kwaraoul.Dry type transformer, a static electrical equipment is used to change the AC current (current) of a certain standard value into another or several types of working voltage (current) with the same frequency and different standard values. According to the supervision sampling inspection data of the third quarter of last year released by AQSIQ, among the 29 kinds of dry-type transformer commodities manufactured by 29 manufacturers in 12 provinces and municipal districts across the country, 6 kinds of commodities were found to be inconsistent with the provisions of relevant specifications, with a compliance rate of 80%& ldquo; This result mostly shows the quality level of China's dry-type transformer industry at the present stage.

The power transformer belongs to relatively durable electrical equipment,KwaraoulPower transformer, and we can't neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below:

.When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet,KwaraoulProcurement of dry type transformers, and then take the oil sample.

Power transformer factory

After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.


Kwaraoul20kV power transformerWhat to do after analysis



The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.

How to select dry-type transformer

Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.

Product survey.After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.

Deterioration damage of transformer core insulation

35kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.


Kwaraoul20kV power transformerWhat to do after analysis



The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

Superior quality.Deterioration damage of transformer core insulation

Visual inspection method for transformer inspection

When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.

Kwaraoul.When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, as in the case of the second phase. There are three reasons for phase deficiency:

Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.

Operation and maintenance management of oil immersed transformer