BolognaHuangshi boarding bridgeWhat to do if it can't start normally

announcer:hp161HP196399230 release time:2024-06-22 17:58:55

the height can be adjusted according to the different vehicles of the goods so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).

Bologna.When working at heights exceeding 1.5 meters, safety nets or safety belts must be used.

The hydraulic boarding bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods, and is our good helper. However, malfunctions during use are inevitable. What should we do when encountering a malfunction?

.When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge,BolognaBoarding bridge platform, mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is 20% higher than the market value! More than one ton is more expensive!

During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.


BolognaHuangshi boarding bridgeWhat to do if it can



Connection for. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

Advantages: The operation results are simpler, the operation is convenient, the stability is good, the safety is reliable and has advantages. It is a common equipment for high-altitude operations.

Slowly reverse and park the container under the lip at the front of the boarding bridge.

Safety and health.During construction, the factors of loading and unloading operations were not taken into account. The platform type loading and unloading bridge serves as a remedial solution and can also meet the requirements for loading and unloading operations into truck carriages. The platform type boarding bridge is also designed in various structural forms according to different on-site conditions. It can also be adjusted up (below the cargo platform) or down (below the cargo platform) within a certain range, which can meet the installation and use of most loading and unloading platforms. Is the boarding bridge easy to use? The boarding bridge is an auxiliary equipment used to bridge with the freight car and is designed to solve the height difference between the freight car and the ground. Suitable for fixed or mobile loading and unloading of goods, it is actually equivalent to a slope, allowing forklifts to smoothly enter the carriage to load and unload goods, requiring only one person to quickly load and unload goods, which is labor-saving.

It is strictly prohibited to apply excessive pile loads around the foundation pit.

What should I pay attention to when choosing a boarding bridge? The selection and purchase of the boarding bridge involves paying attention to three issues, including its range of use, rated load, and other factors; Their understanding of the manufacturer of the boarding bridge, whether their enterprise qualifications, special equipment licenses are complete, how many after-sales service outlets are there in the country, how about their after-sales service attitude, and whether they are timely; The important point is whether the quality is good or not, and whether the price is reasonable. If both of these situations are reasonable,BolognaBoarding bridge steel plate, you can choose the products of the manufacturer.


BolognaHuangshi boarding bridgeWhat to do if it can



There is a flip plate at the top of the bridge deck, which is placed at the edge of the carriage to ensure a smooth transition between the passage and the carriage. Its advantages are as follows.

Recommendation and consultation.As an important part of the boarding bridge the height can be adjusted according to the different vehicles of the goods, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).

Usage scenario: Widely applicable for installation, maintenance, and high-altitude work platform vehicles in industries such as municipal administration, electricity, streetlights, advertising, photography, landscaping, docks, airports and ports, and large industrial and mining enterprises.

Slowly reverse and park the container under the lip at the front of the boarding bridge.

Bologna.When it comes to fixed hydraulic boarding bridges, I believe

The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures improve relevant management systems,BolognaHydraulic fixed boarding axle, strengthen dynamic management of equipment faults, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.

The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil, the relief valve gets stuck or severely worn, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.