Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at 12 o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.

Saint Vicente.How to maintain dry-type transformer?

The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.

.Operation and maintenance management of oil immersed transformer

In terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;

Causes of fire in power transformer


Saint VicenteDistribution transformer procurementIndustry investment boom



What is the wavelength of oil immersed transformer?

The transformer manufacturer shall not use hand touch method to detect energized high-voltage equipment, such as transformer in operation and neutral grounding equipment of arc suppression coil. For the equipment without power supply and whose shell is reliable grounding device, the temperature or temperature rise must be tested by hand. The secondary equipment can be inspected by hand touch method when it is hot and vibrated.

How to reduce the failure of dry-type transformer?

Affordable price.Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation which dissolve and ignite, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.

The key reason for oil leakage is that there are defects in cast iron parts

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:


Saint VicenteDistribution transformer procurementIndustry investment boom



The oil in the machinery and equipment of the oil storage tank shall generally stand for more than 8h before sampling; it is not necessary to stand when sampling on the running power transformer.

equipment maintenance .What is the reason for the shutdown of power transformer?

Maintenance contents of power transformer

The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

Loose core screw

When sampling in bulk gasoline barrels samples shall be selected according to 5% of the number of gasoline barrels,Saint VicenteMain transformer and distribution transformer,Saint VicenteBox transformer recycler, but not less than 2 barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to 2% of the total number of barrels (bottles).