Logronio1000 KVA power dry-type transformerThere are several levels of processing

announcer:hp122HP117294921 release time:2024-06-09 14:44:55

Connection group structure of dry-type transformer

The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.

Logronio.The grounding resistance of, high voltage and bottom voltage shall not be less than 70% (10m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed 2%,LogronioPrice of 1000 KVA transformer, which shall not exceed 2% compared with the last accurate measurement result.

After sampling,LogronioPrice list of 250kVA box type transformer, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.

.Oil immersed transformer company

(II) the height width ratio of dry-type transformer pier installed on the ground is generally 0.5m, and a guardrail of no less than 7m shall be installed around it, samples shall be selected according to 5% of the number of gasoline barrels,LogronioMining dry-type power transformer, but not less than 2 barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to 2% of the total number of barrels (bottles).


Logronio1000 KVA power dry-type transformerThere are several levels of processing



The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?

In fact, the industry has been trying to formulate and upgrade transformer commodities according to the specifications so as to promote the improvement of energy consumption level of transformer commodities.

During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.

Online consultation.For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.

When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.

Careless maintenance and insulation damage


Logronio1000 KVA power dry-type transformerThere are several levels of processing



High voltage fuse of transformer breaks one phase;

Fair price.Wiring mode of dry-type transformer:

The equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing, remove and replace the cracked or brittle leather pad, check and tighten the node, replenish the oil with less oil, check and replace the silica gel of the breathing mask, etc.

When oil samples are used the safety and fire safety technical specifications on the spot shall be strictly implemented.

Logronio.The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.

Before no-load impulse closing, the transformer shall be placed for 24h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

Sound in case of phase failure