DresdenConstruction site construction elevatorWhat are the price and performance advantages

announcer:hp323HP155335083 release time:2024-06-07 21:04:02

The loading and unloading mobile boarding bridge has become a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain and a loading and unloading operation platform for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to quickly enter and exit transportation vehicles for loading and unloading operations.

Install two more standard sections. Check and adjust the verticality of the guide rail frame with a theodolite to ensure that the error in two mutually perpendicular directions meets the requirements of Table 1. The above two parts are about the installation precautions for the elevator. If your work involves operating or installing the elevator, materials, rated loads and brand awareness, the prices of fixed elevators produced in the current domestic market vary. The prices of fixed elevators are: rated loads of 1-5 tons, an elevation of 7 meters, a table size of 2500mm * 2000mm, and around 27000-45000 yuan; The rated load is 1-3 tons, the lifting height is 0 meters, the table size is 2300mm * 2000mm, lifting height, and table size of each fixed elevator vary in price. (Specific bearing capacity and lifting height can be designed and customized according to user requirements)

When the motor connection of the elevator is incorrect, when a coil, coil group, or one phase winding group is connected in reverse, it can cause serious three-phase current imbalance and cause the winding to overheat.

.Four column aluminum alloy elevator: the whole elevator is made of high-strength aluminum profiles. Due to the high strength of the profiles, the four mast structure is adopted, which has excellent stability, flexible operation, large load capacity, large platform area and convenient implementation. Its appearance allows for high lifting capacity in extremely small spaces. Minimize the deflection of the lifting platform.

4: Small scale pneumatic or electric rust removal is based on the principle of using air compression to generate friction or electromagnetic effects to polish and remove rust on the surface of spiral elevators. It can be used for precision instrument push rods or for enterprises that require micro operation of spiral elevators.

The loading and unloading mobile boarding bridge has become a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to quickly enter and exit transportation vehicles for loading and unloading operations.


DresdenConstruction site construction elevatorWhat are the price and performance advantages



A type of elevator equipment consisting of a walking mechanism, hydraulic mechanism, electric mechanism, and support mechanism. The hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve throttle valve,DresdenMovable lifting mobile elevator, hydraulic control one-way valve, and balance valve causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge.

Unique design; Work; The steel frame can withstand average pressure, effectively reducing the torsion of the frame, and has stronger durability.

Hydraulic pump station: domestic lifting platform dedicated pump station, Italian imported pump station with external protective devices: organ m type, mesh type, and iron plate sealed type.

Supply chain quality management.The purpose of the hydraulic lifting platform allows users to choose the power mode and configuration according to their own usage range: the power system includes: DC power supply, single-phase or three-phase power supply, diesel engine.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor,DresdenRail cargo elevator, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

Teach you how to choose elevator cables. When choosing elevator cables, you should follow the following two principles: good electrical parameters; During the movement of the cable with the elevator, there will be a section in the middle that undergoes bending deformation due to gravity, causing changes in electrical parameters such as impedance and distributed capacitance of the cable. Poor quality cables have significant parameter changes when subjected to force deformation,


DresdenConstruction site construction elevatorWhat are the price and performance advantages



What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface,Dresden12 meter mobile elevator, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

query.The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.

What should I pay attention to when starting a new mobile elevator? High priced and various specifications of elevator manufacturers welcome scrap merchants, industrial companies, enterprises, and power departments to visit and negotiate with the company!

Connect the motor naturally to the elevator. When connecting, it is necessary to ensure that the concentricity of the elevator output shaft and the motor input shaft is consistent, and the outer flanges of the two are parallel. Inconsistent alignment can lead to motor shaft breakage or elevator gear wear.

Dresden.Three column aluminum alloy elevator: Three sets of masts support the synchronous lifting of the working platform, and the support structure is the same as that of a single masted platform, and can be assembled or disassembled in one lift.

What is the solution to the problem of surface rust on the spiral elevator? The deficiency is that sandpaper has a significant loss on the spiral elevator itself.

The current should exceed the rated current, and even cause the motor to stop on its own. If the shutdown time is slightly longer and the power supply is not cut off, the winding will not only overheat severely, but also burn out. When a star connected motor is mistakenly connected into a triangle, or a motor with multiple coil groups connected in series into a branch is mistakenly connected into two parallel branches, and in severe cases, the winding will be burned out.