ClichyMobile lifting boarding bridgeQuality level

announcer:hp161HP196399230 release time:2024-06-01 19:13:41

Connection for. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

Clichy.Remove and disassemble the lowering valve blow the valve core clean with compressed air, and then reinstall it.

Slowly reverse and park the container under the lip at the front of the boarding bridge.

.During the application process of hydraulic boarding bridges, it is necessary to follow the operating procedures to ensure the normal operation of the equipment. What precautions should we take when using hydraulic boarding bridges?

Open planning before placement makes it easy to clean up clutter.

When it comes to fixed hydraulic boarding bridges, I believe


ClichyMobile lifting boarding bridgeQuality level



When the hydraulic oil is insufficient, causing air to enter the hydraulic oil and also producing high noise. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

The outstanding characteristics of air suspension are good smoothness,ClichyContainer boarding bridge, less maintenance, significant improvement in protection of cargo compared to steel plate suspension, and greatly reduced damage to the entire vehicle and road surface. The leaf spring produces different bending under different loads, so the distance between the whole vehicle and the ground is always changing. If the load is increased while keeping the spring unchanged, it will also reduce the natural frequency of the spring and even change the characteristics of the spring. The air spring is based on the compressibility of air. The air enclosed in the air bag is an element. Different air bag pressures of the air spring system balance different loads. When the height of the air bag is fixed, the distance between the car body and the road surface remains unchanged.

What are the issues to pay attention to when using the boarding bridge? For example, mobile boarding bridges are generally used outdoors, and after use, they are also placed outdoors. They are often exposed to wind rain, and sunlight, which reduces the lifespan of the boarding bridge. Therefore, the maintenance of the boarding bridge is very important. When it rains, cover the boarding bridge with a rain cloth to prevent rusting and aging.

knowledge.Install a 5m high protective railing around the foundation pit of the simple boarding bridge,ClichyHydraulic fixed boarding axle, with a distance of no less than 1m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate, without the need for power supply, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support, support first and then excavation, layered excavation, no overbreak&rquote; The principle of.

Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.

For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.


ClichyMobile lifting boarding bridgeQuality level



The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

project.Slowly reverse and park the container under the lip at the front of the boarding bridge.

When working at heights exceeding 1.5 meters, safety nets or safety belts must be used.

Portable hydraulic press boarding bridge: It is a widely used type, suitable for places where loading, unloading,ClichyMobile boarding axle hydraulic pressure, and transportation are not fixed or moving; Mobile hydraulic press boarding bridge: suitable for fixed and immovable goods such as ports, cargo platforms, warehouses, etc

Clichy.The hydraulic system adopts imported Italian brand products, with excellent performance and minimal maintenance. The oil cylinder lifting power system, inclined plate, and small oil cylinder operation, can be adjusted smoothly. The height adjustment plate is a selected decorative plate and profile, with a long service life. Various qualified manufacturers of boarding bridges are welcome to inquire by phone and sincerely invite cooperation!

After the boarding bridge work is completed all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.

The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, strengthen dynamic management of equipment faults, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.