Huozhou2 meter electric elevatorHow to ensure quality in the production process

announcer:hp935HP175192871 release time:2024-05-26 20:15:20

Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door

Setting requirements: For construction electric elevators that operate in multiple shifts,HuozhouElectric small hydraulic elevator, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Huozhou.The impact load can cause early wear, fracture, and fragmentation of mechanical structural components, as well as generate impact pressure in the hydraulic system, which in turn can damage hydraulic components, oil seals,HuozhouUsed electric elevator platform, and high-pressure oil

Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

.Use floor doors and cage door devices on construction sites where conditions permit.

Remind customers that there are still many areas to pay attention to when maintaining and maintaining the lifting platform. We also hope that customers and friends can pay more attention when using it to ensure the safety of personnel and property, regularly maintain and extend its service life, and create greater benefits for the enterprise. What is the matching degree of electric elevators? Everyone has always been confused. In short, the matching degree of electric elevators is how the height of the electric elevator can be combined with the operating height. Electric elevators are not used frequently, We suggest considering purchasing a guide rail electric elevator or a scissor fork electric elevator. The scissor fork electric elevator can achieve a maximum load capacity of 100 tons, which effectively solves the problem of load capacity. If the frequency of use is too high and the height is relatively high, we recommend using a guide rail electric elevator. This type of electric elevator is not easy to malfunction under high-frequency operation, By solving the load capacity and frequency of use, and the rotary valve can reduce oil pipeline channels and optimize line settings.

Flat screw mechanical electric lifting mechanism: The lifting platform of this structure has the advantages of small civil engineering coordination, shallow foundation pit required, large stroke, stable operation low noise, accurate positioning, and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table it can be stopped arbitrarily within the range of travel.


Huozhou2 meter electric elevatorHow to ensure quality in the production process



Setting requirements: The landing door should be standardized and tooled.

Equal effect.

Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

Meticulous workmanship.Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

Later, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.

News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged,HuozhouPure electric curved arm elevator, making the further development of lifting platform vehicles possible.


Huozhou2 meter electric elevatorHow to ensure quality in the production process



To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, ensuring the safety of the cast members.

OK or not?.Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

Construction electric elevators should be equipped with lower limit switches that are sensitive and reliable.

Setting requirements: The wall bracket should use the manufacturer's matching standard products.

Huozhou.Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).