Blaise goldfreiburgModel of three-phase oil immersed transformerWhat are the vibration reduction methods

announcer:hp122HP117294921 release time:2024-05-26 10:02:12

Operation and maintenance management of oil immersed transformer

For 630kVA power engineering transformer, plastic parts are selected in the middle of iron core, observe and detect that the input and output voltage meets the regulations. At the same time,Blaise goldfreiburgPrice list of power transformer, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

.Sound in case of phase failure

The whole process of hanging the core of dry-type transformer is more critical,Blaise goldfreiburgDry type transformer procurement,Blaise goldfreiburgImpedance standard for dry type transformer, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!

The noise of dry-type transformer comes from


Blaise goldfreiburgModel of three-phase oil immersed transformerWhat are the vibration reduction methods



When sampling in bulk gasoline barrels, samples shall be selected according to 5% of the number of gasoline barrels, but not less than 2 barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to 2% of the total number of barrels (bottles).

With Vietnam and Malaysia, China's first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.

High voltage fuse of transformer breaks one phase;

Sincere service.During no-load test run the transformer shall be connected with the working voltage from the switching power supply side, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.

On load commissioning:


Blaise goldfreiburgModel of three-phase oil immersed transformerWhat are the vibration reduction methods



Oil leakage at looper flange

Quality recommendation.What is the reason for the shutdown of power transformer?

The rate of transformer is: n = P2 / p1x1o%, that is, the rate is very large. Therefore, the load of transformer is: 0 = P / PK. Fully consider the active power loss caused by reactive power in the system software during transformer operation. The load adjustment is: it can be seen from the calculation of load formula that the large rate of transformer does not occur when the load is full, Generally, it is about 50%, but when selecting the transformer capacity we should select effective transformers according to the load condition and load, so as to make the transformer in the situation of economic development and achieve the goal of power saving.

Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

Blaise goldfreiburg.The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at 12 o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.

The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.

When the screw of the through core extruder holding the iron core of the transformer is loose, there are screw cap parts left on the iron core or small metal materials fall into the transformer, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak, squeak & rdquo; It's like a magnet sucking a small washer, while the working voltage, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer, and can be solved until power failure.