GedlerSelf propelled electric elevatorHow to operate during construction

announcer:hp935HP175192871 release time:2024-05-24 14:01:09

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Protective measures should comply with regulatory requirements.

Gedler.Greater than 0.04s; When the hydraulic buffer is used, the oil level shall be checked, and the action of the hydraulic buffer shall be monitored by the Electrical safety switch. When the hydraulic buffer is compressed, the cage shall not

During loading and unloading,GedlerElectric elevator mobile type, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

.Horizontal lead screw mechanical electricity

Setting requirements: The installation and dismantling workers, electricians, with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern, the lifting platform, and rear car turntable perform a rapid transformation of the entire or partial scene. This arrangement allows for rapid switching of three full sets.

There is a certain itinerary.

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

investment.Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.


GedlerSelf propelled electric elevatorHow to operate during construction



The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

quality.Steel wire ropes pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T20118; Maintenance,GedlerElevator electric micro, wear,GedlerHigh altitude electric elevator, deformation, and corrosion of steel wire ropes

The counterweight steel wire rope should be equipped with an anti loosening device that is sensitive and reliable.

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

Gedler.Setting requirements: The landing door should be standardized and tooled.

Stage equipment safety door. To prevent personnel from extending their heads hands, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.