MarseilleAmorphous alloy oil immersed transformerQuality level

announcer:hp122HP117294921 release time:2024-05-24 12:25:50

Power transformer plant

If the above provisions are not met the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N2 shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.

Marseille.The equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing remove and replace the cracked or brittle leather pad, check and tighten the node, replenish the oil with less oil, check and replace the silica gel of the breathing mask, etc.

For no-load impulse closing of transformer, pay attention to the following matters:

.A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.

The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.

Oil leakage of cast iron parts


MarseilleAmorphous alloy oil immersed transformerQuality level



The method and whole process of taking oil sample of power transformer are as follows:

At rated power, the ratio of output power to input power of transformer is called the efficiency of transformer, i.e. & ETA; Is the efficiency of the transformer; P1 is the input power and P2 is the output power.

The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

Excellent quality.Noise pollution control and prevention measures of dry-type transformer

Before application, the sampling container shall be cleaned with vehicle gasoline, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.

& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger,MarseilleLoss table of distribution transformer, the resistance value exceeds 2m ohm bus.


MarseilleAmorphous alloy oil immersed transformerQuality level



If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl,MarseillePower transformer function, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

Workshop cost.How to reduce the failure of dry-type transformer?

Transformer manufacturers generally adopt IP20 protective casing, which can avoid the entry of solid dirt with a diameter of more than 12mm, snakes,MarseilleApplication scope of oil immersed transformer, cats, birds and other animals, resulting in vicious common faults such as short-circuit fault and power failure, and provide a safe natural barrier for the energized part. If the transformer equipment must be outdoors, IP23 protective casing can be adopted, which can avoid being equally divided with the above IP20 protective effects However, IP23 casing will reduce the refrigeration capacity of the transformer, so pay attention to the reduction of its operating volume.

The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

Marseille.Noise pollution control and prevention measures of dry-type transformer

Solenoid insulation deterioration

How much is the power transformer