How to reduce the failure of dry-type transformer?

The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, common faults and impact. The work is diligent.

Rijeka.Two point grounding device of iron core caused by residual welding scar;

Power transformers are used in all walks of life

.Power transformer factory

Before no-load impulse closing, the transformer shall be placed for 24h and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

Oil immersed transformer company


RijekaWaste power transformerCalculation method of pressure capacity



The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?

First of all, although dry-type transformer has strong moisture resistance, it is generally open structure or very susceptible to moisture,RijekaS13 oil immersed transformer,RijekaPrice of 50 KVA box type transformer, especially the insulation level of dry-type transformer manufactured in China is low (lower flame retardant grade) Therefore, the dry-type transformer can obtain high stability only when the air humidity is below 70%. The dry-type transformer shall also be prevented from stopping operation for a long time to prevent serious damp. When the grounding resistance value is less than 1000 / V (operating voltage), it indicates that the transformer is seriously damp, and the trial operation shall be terminated.

The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.

equipment maintenance .A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.

Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.


RijekaWaste power transformerCalculation method of pressure capacity



The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

recommend.How much is the power transformer

The step-up dry-type transformer refers to the instantaneous operation of voltage. At this stage, there are few manufacturers of dry-type transformer that can reasonably guarantee the instantaneous step-up in China. The step-up dry-type transformer has strong step-up capacity and good practical effect. The difference depends on that the transformer power switch without excitation regulator does not have the ability to change gear with load. Because this kind of tap power switch can cut off the whole process in a short time during the whole process of gear change, cutting off the load current will cause arc burning between circuit breakers tap power on and off or short circuit fault, so the dry-type transformer shall be powered off during regulation. Therefore, it is generally used as a dry-type transformer that is not very strict in voltage regulation and does not need to be adjusted frequently.

The insulating layer in the middle of the silicon steel plate is aging, the anchor bolt cover with the iron core is damaged, the iron core causes large vortex,RijekaPower transformer oil immersed, resulting in heat, temperature rise, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.

Rijeka.The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding, needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.