Secondly, for the replacement of hydraulic oil on the lifting platform, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, and ensure that the lifting platform can be lifted to the rated lifting height.

After working for 10000 hours, repair the mechanical and electrical systems of the elevator.

Songshan.When using, the weight should be evenly distributed, mainly in the center of the countertop. However, for special cases, partial loading is allowed, but the longitudinal load cannot exceed half of the rated load. The horizontal load should not exceed one-third of the rated load, so this detail needs to be noted during use.

The elevator has undergone strict testing before leaving the factory. If the pressure regulating valve is adjusted arbitrarily by non manufacturers, it may cause abnormal system operation. Non professionals should not adjust the pressure regulating valve arbitrarily!

.two

When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, slopes, or cliffs,SongshanManufacturer of automatic hydraulic lifting platform, guardrails or safety nets should be installed on the side facing the air, or safety belts or ropes should be used.

Check the hydraulic oil quality and level. When the lifting platform is raised to a high position, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part tighten the pipe joint.


SongshanLarge lifting hydraulic platformIndustry Outlook Forecast



Original software

In this situation, it is necessary to regularly check all wires and cables used to ensure that there is no damage. When there is wrapping or damage, the parts should be replaced in a timely manner. I believe many people have encountered overheating in electric motors. In this case, it is necessary to stop the motor in a timely manner, and then troubleshoot the problem before continuing to use it. This way, the motor shaft can be used and the effect is good.

When the motor overheats,SongshanSmall hydraulic platform lift truck, it should be stopped immediately, and after troubleshooting, it should continue to operate. The motor bearings should be in good condition.

Welcome calls .If the elevator malfunctions, non electrical professionals are not allowed to disassemble and assemble electrical appliances at will to prevent accidental connection or electric shock!

Regardless of the type of lifting platform used, people are more concerned about the stability during use. Because the stability not only affects the actual use effect but also has varying degrees of impact on the safety during use, it is necessary to pay appropriate attention. The same applies when using fixed loading and unloading platforms, but many times the stability of this type of platform can be trusted. The reason for saying this is because the manufacturer has taken this issue into account during production and manufacturing, and the following aspects are taken to avoid this situation.

The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.


SongshanLarge lifting hydraulic platformIndustry Outlook Forecast



The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test check whether the seat belt is broken or deformed,SongshanAutomatic hydraulic lifting platform, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.

Work courses.Special manufacturing processes. Everyone knows that fixed loading and unloading platforms can have a good market performance, which is closely related to the advanced manufacturing technology of manufacturers. In fact, there are still many advanced processes that can be used nowadays. If used appropriately in daily production and manufacturing processes, it can still improve the quality and production efficiency of manufacturers' products to a certain extent. As for this type of loading and unloading platform, manufacturers use many special manufacturing processes during production, check the connections of each part during use and tighten them in a timely manner if there is any looseness. All connecting shafts require the use of split pins in order to ensure sufficient use and better utilization.

Convert to Simplified Chinese Convert to Traditional Chinese without converting the number of blank lines between paragraphs before and after:

Songshan.Using Help

Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.