The hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).

During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

arsenic.Setting requirements: Steel wire rope electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the cage until it passes through the

The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.

.The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer

The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.


arsenicElectric folding elevatorCan reduce wrinkles by controlling the production process



Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

The counterweight steel wire rope should be equipped with an anti loosening device that is sensitive and reliable.

To ensure safe and reliable braking of the lifting platform and prevent accidents, a hydraulic control one-way valve, also known as a hydraulic lock is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease,arsenicGuide rail electric elevator, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.

Excellent service.Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

Before operating the construction electric elevator, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

Quality improvement.The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.

Electric elevators should be regularly maintained and cleaned. During maintenance and cleaning,arsenicElectric automatic elevator, the bracket should be supported to prevent the electric elevator from overturning. Electrical and hydraulic systems should be maintained by professional personnel; When the battery level display is less than 40%

The verticality of the guide rail frame should meet the requirements of the specifications.

arsenic.To ensure safe and reliable braking of the lifting platform and prevent accidents, a hydraulic control one-way valve, also known as a hydraulic lock, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease,arsenicElectric tatami elevator, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Later, when there is a major malfunction of the lifting platform, it should not be used again to avoid accidents, personnel and property losses.