Big goatPower transformer calculation sheetIndustry-specific processing

announcer:hp122HP117294921 release time:2024-05-13 14:09:43

The method and whole process of taking oil sample of power transformer are as follows:

High voltage fuse of transformer breaks one phase;

Big goat.The proper selection of Anhui dry-type transformer has a key effect on improving the safety and smooth operation of power system software. In the above original text, we have already mastered the structure and characteristics of dry-type transformer. In this part,Big goat10kV oil immersed distribution transformer, we will describe how to select dry-type transformer according to the load characteristics and application environment of dry-type transformer.

The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

.The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.

Oil leakage at looper flange

Oil leakage at looper flange


Big goatPower transformer calculation sheetIndustry-specific processing



Oil leakage at looper flange

What is the cause of power transformer core failure?

The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.

Product range.After the test, connect the data signal contact of the automobile relay with the alarm circuit the pull-in contact with the opening circuit,Big goatLightning protection of distribution transformer, and adjust the overcurrent protection value.

Oil leakage of cast iron parts

Oil immersed transformer


Big goatPower transformer calculation sheetIndustry-specific processing



The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.

Quality assurance.Oil leakage of porcelain pot and laminated glass oil level gauge

In order to promote the use of energy-saving transformers,Big goatAll transformers, the Ministry of finance, providing subsidies of 4-30 yuan / KVA for energy-saving transformers.

Therefore, in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, disconnect the switching power supply at the fault point if all fields are clear, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.

Big goat.It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.

Power transformer plant

When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.