ColognePortable electric elevatorWhat is the source of

announcer:hp935HP175192871 release time:2024-05-13 09:53:08

CologneSelf propelled electric elevator,

Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

Protective measures should comply with regulatory requirements.

Cologne.The body in the lateral adjustment device of the driving plate should ensure a compressed state, so that the gear has a certain radial constraint, and ensure that the gear and rack always mesh well throughout the entire operation.

Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

.The counterweight guide rail should meet the specification requirements.

The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.


ColognePortable electric elevatorWhat is the source of



The quality of the standard section should comply with the product manual and specification requirements.

The usual operation of landing and docking. The installation position of the upper limit switch should comply with the following: when the lifting speed is less than 0.8m/s, the upper safety distance L left after the upper limit switch is triggered by the hanging cage should not be less than

Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.

install.The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.

Horizontal lead screw mechanical electricity

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.


ColognePortable electric elevatorWhat is the source of



There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

Total quality assurance.When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, but safety should be maintained.

The isolation and buffering rubber in various parts of the aluminum alloy electric elevator drive device are intact and tightly fitted.

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

Cologne.Monthly maintenance and inspection of hydraulic lifting platform rollers intermediate shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process oil cylinder pin shafts and bearings,CologneElectric tripod elevator, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky,CologneElectric hydraulic folding elevator, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter