With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.

Naturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.

Estol.Right, as & ldquo; Great Lars car & rdquo;, but the main parameters of the two transformers are evaluated as shown in Table 1. Table 1 evaluates the main parameters of the transformer: capacity (VA) iron loss (W) copper loss (W). Firstly, the output power is saved according to the customary calculation method (ignoring copper loss): the results show that the loss of large capacity transformer is lower than that of small capacity transformer, It actually consumes electromagnetic energy.

When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.

.Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, please cut off the input switching power supply.

If the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.

The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.


EstolRecycling power transformerAccuracy analysis



Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer,EstolPower transformer specification, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.

At that time, only a few companies in China could produce 500kV high-voltage transformers, and the market share of high-voltage transformers was basically monopolized by overseas leaders.

(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

index.When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore the hanging core of dry-type transformer should be carried out according to the above matters, such as low-frequency vibration damping platform high-frequency vibration damping mechanical equipment so as to promote the safety of dry-type transformer!

Gradually,EstolTransformer three-phase transformer, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.


EstolRecycling power transformerAccuracy analysis



In terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;

How much is it.When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.

What is the cause of power transformer core failure?

Oil leakage of porcelain pot and laminated glass oil level gauge

Estol.With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design,EstolRecovery of transformer cabinet, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.

Difference between dry-type transformer and oil immersed transformer:

The insulating layer in the middle of the silicon steel plate is aging, the iron core causes large vortex, resulting in heat, temperature rise, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.