If you want to check the activated carbon fiber for the hanging cover, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear 4 round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for 100mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.

Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).

Joe Babo.First of all, although dry-type transformer has strong moisture resistance, it is generally open structure or very susceptible to moisture, especially the insulation level of dry-type transformer manufactured in China is low (lower flame retardant grade) Therefore, the dry-type transformer can obtain high stability only when the air humidity is below 70%. The dry-type transformer shall also be prevented from stopping operation for a long time to prevent serious damp. When the grounding resistance value is less than 1000 / V (operating voltage), it indicates that the transformer is seriously damp, and the trial operation shall be terminated.

Connection group structure of dry-type transformer

.The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils,Joe BaboDry type transformer 125kva,Joe Babo20kV power transformer, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.

& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger,Joe BaboDistribution transformer video, the resistance value exceeds 2m ohm bus.

The hanging core of dry-type transformer is a vital part


Joe BaboManufacturer of 80 KVA dry type transformerIndustry development trend



The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.

The insulation between silicon steel sheets is damaged, resulting in overheating and melting of the iron core;

The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

Inspection items.35kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.

Noise solution of dry-type transformer

After sampling bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.


Joe BaboManufacturer of 80 KVA dry type transformerIndustry development trend



Loose core screw

quality standard.Power transformer plant

Transformer inspection ear

In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

Joe Babo.Power transformer

The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.

When the power transformer operates at full load, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.