DresdenHandmade children's hydraulic lifting platformThe performance of quality regulations has reached this year's good level

announcer:hp695HP135175170 release time:2024-05-09 19:53:11

DresdenFixed electric hydraulic lifting platform,

Outdoor elevators and factory cargo elevators are heavy lifting mechanical equipment. Outdoor elevators are used for transporting goods between floors of buildings, and are specialized hydraulic cargo elevator products. They are mainly used for transporting goods up and down between various working floors; Vertical garage and car lift between garage floors. The hydraulic system of the product is equipped with anti fall and overload protection devices, and operation buttons can be set on each floor and lifting platform workbench to achieve multi-point operation.

The contact opening and closing of the travel switch of each safety device must be reliable, and the contact crater should be polished in a timely manner.

Dresden.Many people believe that the mechanical strength of the elevator itself is relatively high when using it, so they did not strictly follow the installation method specified in the manual during the installation process. Little did they know that this would cause increased wear and tear of the parts and inflexible operation. In addition, they should pay attention to the installation precautions corresponding to the working environment and not be careless. Proper installation, use, and maintenance of elevators are important steps to ensure the normal operation of mechanical equipment. Therefore, when installing the elevator, please be sure to strictly follow the installation and use related matters below, and carefully assemble and use it.

Replace with new oil and do not intermittently use old oil, otherwise the moving parts in the system will accelerate wear.

.It is strictly prohibited to connect the motor of the lifting platform to the wrong power supply. It should be ensured that the voltage is 380V or 220V, and daily cleaning work should be carried out. Dust and debris on the motor should be cleaned in a timely manner.

Maintain a smooth access road for external construction elevators and sufficient parking space for equipment. When using a crane for auxiliary installation, full consideration should be given to whether the on-site environment meets the operating conditions of the crane.

When installing, disassembling, and adjusting the rotating mechanism, it is important to ensure that the centerline of the reducer of the rotating mechanism is parallel to the centerline of the gear and its meshing surface is not less than 70%. The meshing clearance should be suitable.


DresdenHandmade children



With the increasing demand for boarding bridges, mobile boarding bridge merchants are increasingly interested in using boarding bridges to provide customers with the appearance of hydraulic boarding bridges, and the demand for boarding bridges is also increasing. However, there are not many manufacturers of corresponding boarding bridges. Many boarding bridges are made of leather bags, and they do not produce them themselves, resulting in high prices. What is important is that they do not have a good understanding of the technology of car exhibition booths. When passing on direct customer technical requirements to the manufacturers, there are often deviations. Therefore, customers who purchase boarding bridges can directly find professional manufacturers. When choosing a boarding bridge, the first thing to consider is the range of use, frequency of work, utilization,DresdenFixed hydraulic lifting platform, rated weight, and other factors of the product, and choose a boarding bridge that is suitable for the requirements of the unit. Conduct market research based on the proposed technical parameters. The first condition for selecting a supplier is to consider the manufacturer of the boarding axle, and then the after-sales service capability. As long as it is a fixed boarding bridge with good product quality, excellent performance, it can be chosen at a reasonable price.

The current should exceed the rated current, and even cause the motor to stop on its own. If the shutdown time is slightly longer and the power supply is not cut off, the winding will not only overheat severely, but also burn out. When a star connected motor is mistakenly connected into a triangle, or a motor with multiple coil groups connected in series into a branch is mistakenly connected into two parallel branches, it will cause the winding and iron core to overheat and in severe cases, the winding will be burned out.

What are the pressures on lifting platforms? The movement of lifting platforms has always been a concern for us. Our usage scenarios are uncertain, and most of them are part-time workers. Therefore, in order to better attract customers, we are constantly researching mobile lifting platforms to meet different needs. However,DresdenHydraulic lifting platform, for some large logistics or enterprise processing plants, we are still accustomed to using fixed elevators, He has a huge load capacity and strong stability, which can meet the needs of many customers, due to the large load, there is also significant friction between various components, especially the elevator chain and elevator shaft pins. It is necessary to ensure that an appropriate amount of oil is added before each use to ensure flexibility and non jamming during operation. If the elevator is in operation and once&quo; appears; Squeak and Squeak&# quo; The friction sound can be basically determined to be due to a lack of oil in the elevator. It is necessary to immediately stop working and investigate the cause, and cannot forcibly operate, which can easily cause unforeseeable hidden dangers. Summary: Regular refueling is not allowed when maintaining the elevator.

Hydraulic oil should be kept clean and replaced every 6 months; When repairing, and cleaning the elevator, be sure to support the support rod.

How to install and use the bearings of the elevator? During the process of using the bearing device of the elevator, we cannot always ensure that the bearing device has the right orientation, it will cause the clearance between the bearings to become too small, and then make it impossible for the inner and outer rings of the bearings to be in the same rotation center. So it is necessary to use specialized tools when installing bearings and in the future, it is also necessary to use a testing instrument to test the bearing installation, in order to ensure the success of the bearing installation.


DresdenHandmade children



The guide rail type cargo elevator has been inspected and debugged before leaving the factory, and all technical indicators have met the design requirements. When in use, only the power supply needs to be connected, and the hydraulic and electrical systems do not need to be adjusted.

Product range.The size of the oil cylinder should be minimized as much as possible while meeting the design requirements. The smaller the size of the oil cylinder, the faster the lifting speed.

When using the hydraulic lifting platform it is also necessary to check for overheating, as this equipment is equipped with a motor. If the motor is overheated, replacing a motor is relatively expensive. Therefore, during driving or trial operation, if the motor is found to be overheated, it should be stopped immediately, and then the fault that caused the motor to overheat should be checked and eliminated, Only then can the machine continue to be used.

When working in a hot environment, pay attention to heat dissipation.

Dresden.The lifting platform has been inspected and debugged before leaving the factory, and all technical indicators meet the design requirements. When in use, only the power supply needs to be connected, and the hydraulic and electrical systems basically do not need to be adjusted.

According to Beijing regulations, the arrival time is within 30 minutes.

When personnel enter the interior of the lifting platform for maintenance of outdoor elevators, they must hang the elevator to prevent sudden lowering of the platform and causing casualties.