Hu Gewen6-meter electric elevatorPrecautions for purchase

announcer:hp935HP175192871 release time:2024-05-09 11:48:03

Electric elevators used in various places.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

Hu Gewen.Setting requirements: Steel wire rope electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices,Hu Gewen200 kg electric elevator, which should have compliant loosening rope switches and be able to interrupt any movement of the cage until it passes through the

Construction electric elevators outside the lightning protection range

.The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

The quality of the standard section should comply with the product manual and specification requirements.

The use of a lifting platform as a tool for storing performance blankets, soft scenery, etc. In some theaters,Hu GewenElectric water gate elevator, soft scenery, etc.


Hu Gewen6-meter electric elevatorPrecautions for purchase



The landing door should meet the requirements of the specifications and achieve standardization.

Setting requirements: Buffers should be installed below the suspension cage and counterweight running channel.

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

Manufacturing cost.The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator,Hu GewenFire electric elevator, with a size of 8 meters by 2 meters.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.


Hu Gewen6-meter electric elevatorPrecautions for purchase



Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

Home page recommendation.Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered down

Setting requirements: Buffers should be installed below the suspension cage and counterweight running channel.

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

Hu Gewen.Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

Horizontal lead screw mechanical electricity

When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.