OstrovinkaMobile boarding bridgeCommon faults and troubleshooting methods

announcer:hp161HP196399230 release time:2024-05-04 10:22:31

Hydraulic boarding bridges should strictly adhere to the principle of being overweight, as overloading may cause damage to objects; Working on a lifting platform without protective barriers may cause personnel to fall and cause casualties.

The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve,OstrovinkaMobile hydraulic boarding bridge, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

Ostrovinka.When working at heights exceeding 1.5 meters, safety nets or safety belts must be used.

The length of the electric hydraulic boarding bridge is generally about 10 meters and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons,OstrovinkaMobile boarding axle hydraulic pressure, 11200m for 8 tons, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

Slowly reverse and park the container under the lip at the front of the boarding bridge.

Common&quo; Streamline” Open joint planning, with a welding area more than three times that of other traditional pipeline joints, greatly extending the service life and protection life.


OstrovinkaMobile boarding bridgeCommon faults and troubleshooting methods



Portable hydraulic press boarding bridge: It is a widely used type, suitable for places where loading, unloading, and transportation are not fixed or moving; Mobile hydraulic press boarding bridge: suitable for fixed and immovable goods such as ports, cargo platforms, warehouses, etc

Outdoor elevators and factory cargo elevators are heavy lifting mechanical equipment. Outdoor elevators are used for transporting goods between floors of buildings, and are specialized hydraulic cargo elevator products. They are mainly used for transporting goods up and down between various working floors; Vertical garage and car lift between garage floors. The hydraulic system of the product is equipped with anti fall and overload protection devices, and operation buttons can be set on each floor and lifting platform workbench to achieve multi-point operation. Long term promotion of axle manufacturers' complete products, excellent quality, and discounted prices

Shake the handle to raise the boarding bridge to the height of the container.

Convenient and efficient.Embedded boarding bridge, as the name suggests, refers to the boarding bridge embedded in the loading and unloading operation platform. The installed boarding bridge main board surface is horizontal with the upper plane of the loading and unloading operation platform. Completely integrated into the platform it will not affect other operational tasks on the platform without loading and unloading operations. The boarding bridge with this type of structure is widely used and is also a relatively fast boarding auxiliary device. Its design is usually fully standardized as early as the structural design of buildings. We are a long-term manufacturer of boarding bridges. Welcome to inquire

When working in foundation pits or depths,OstrovinkaDesign of mobile boarding bridge, a helmet must be worn.

There is a flip plate at the top of the bridge deck, which is placed at the edge of the carriage to ensure a smooth transition between the passage and the carriage. Its advantages are as follows.


OstrovinkaMobile boarding bridgeCommon faults and troubleshooting methods



Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

Safety and health.The electronic operation is very simple. With just one button, the air conditioning panel will automatically rise. Release the button, adjust the plate to reduce itself, and the hinge is used on the truck.

B) When maintaining the hydraulic system, only clean plastic plugs can be used to seal the ends of the pipeline.

Reason for the lifting table not lowering: The lowering valve is malfunctioning, and the lowering speed valve is out of adjustment. Solution: When pressing the lowering button, check if the lowering valve is energized. If there is no electricity, try to eliminate it; If there is electricity, troubleshoot the lowering valve itself or replace the lowering valve. The lowering valve should be kept clean.

Ostrovinka.The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, strengthen dynamic management of equipment faults, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.

During excavation, if unidentifiable items or unforeseeable situations are found the operation should be stopped in a timely manner and reported to the person in charge of the hydraulic boarding bridge for handling. The fixed boarding bridge is an auxiliary equipment for loading and unloading in conjunction with the storage platform. This equipment is integrated with the platform and can be adjusted up or down according to the different heights of the truck carriage, making it convenient for forklifts to enter the carriage. The equipment adopts an imported hydraulic pump station with anti rolling skirts on both sides, making work safer and improving work efficiency.

The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm, mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is 20% higher than the market value! More than one ton is more expensive!