To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, ensuring the safety of the cast members.

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

Cologne.The water cooling of hydraulic stations is generally tubular water cooling. The selection is based on the heat load to calculate the heat exchange area, while the air-cooled electric elevator uses an air cooler to calculate the heat exchange capacity based on the heat load. Then, the selection calculation is carried out under the condition of satisfying the flow rate. So, these two types of cooling are different and have significant differences.

Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

.The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

The landing door should meet the requirements of the specifications and achieve standardization.


ColognePlatform electric elevatorExecutive standard



Setting requirements: The wall bracket should use the manufacturer's matching standard products.

In addition to fixed modes, there are also types of car mounted mobile devices. As the name suggests, this type of lifting device is a combination of lifting equipment and car mounted systems. It is very flexible to move, and of course, it is better to use it. For example, there are such lifting devices in airports,CologneElectric mobile elevator, and car stations or sports stadiums may also be equipped with such devices, as they can be moved, So the scope of the operation is not limited to a specific place, but can be used wherever lifting operations are required. For example, some advertisements are relatively high in height. At this time,CologneSimple electric elevator, mobile lifting equipment can be used to transport billboards or staff to the designated height for work. This type of equipment can also be divided into two types based on the driving mode: hydraulic lifting and electric lifting. The so-called hydraulic lifting is the use of hydraulic oil to drive and reach a specified height. The electric mode is driven by a motor or teeth to lift to a certain height. However, currently, hydraulic lifting platforms are more widely used.

From the above comparison, it can be seen that hydraulic electric lifting mechanisms have stable lifting, low noise, long service life, large load bearing capacity, and are relatively simple, making them suitable for use in stage equipment.

Installation materials.Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, and the top floor height can be installed at least 2.5 meters.

The L distance depends on the selected wall mount model.


ColognePlatform electric elevatorExecutive standard



The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions its calculation sheet, design, and verified by experts.

build.Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected and standard sections and other components with severe wear and deformation should be replaced.

Safety devices: Electric elevators for construction should be equipped with overload detection devices. When the load inside the cage exceeds 10% of the rated load capacity,

Advantages of electric elevator rotary valve: Simplify the installation of electric elevator pipelines; The operation is more convenient, and the valve can be opened and closed at any time; The installation of a rotary valve reduces the friction of the sealing components; Compact structure, small size, and space saving; Increased the service life of electric elevator pipelines and solved the problem of easy oil leakage.

Cologne.Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, stability, etc., and the production should meet the design requirements.

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting,CologneWarehouse electric elevator, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark sticky, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.