Winnie snowHydraulic flipping integrated unloading platformIntroduction to the selection skills of homework methods

announcer:hp391HP142030639 release time:2024-05-03 11:45:46

Pay attention to checking each part of the steel wire rope for broken wires and loose strands. If the tide passes through the relevant regulations, it must be replaced immediately. The maintenance and upkeep of steel wire ropes should strictly follow the provisions of GB5144-85.

Shafts must have split pins and be sufficient.

Winnie snow.The characteristics of hydraulic lifting platforms are obvious, such as their relatively light overall weight and good maneuverability, allowing even a single person to operate, making them relatively suitable. The mast columns of its system are equipped with guide wheels, so its lifting and lowering are relatively stable during use. Of course, attention should also be paid to the structure of the hydraulic lifting platform to ensure its compact structure,Winnie snowPlatform hydraulic lifting platform, and then you can smoothly open the door. Of course, some small and narrow channels are also possible,Winnie snowFixed lifting platform hydraulic pressure, so we need to pay attention to this point.

Troubleshooting: When the elevator power light is turned on, press the up button, the motor rotates, but the lifting platform does not rise. This may be due to the reversal of the motor after the three-phase power supply is connected, just change the two phase wires of the heavy machine.

.Website homepage

Head signature:

Original software


Winnie snowHydraulic flipping integrated unloading platformIntroduction to the selection skills of homework methods



The brakes of each mechanism should be regularly checked and adjusted for the clearance between the brake pads and brake wheels to ensure flexibility and reliability. There should be no dirt on the friction surface. If there is dirt, it must be cleaned with gasoline or rare materials.

When a hydraulic lifting platform malfunctions, it is necessary to take time to prepare accordingly. At this time, it is necessary to provide timely feedback or communicate with the manufacturer. If a voltage range is used to detect the hydraulic lifting platform, it is necessary to turn on the power in this case. The circuit schematic is used to measure the electrical circuit. At this time, the voltage value can be measured, and the voltage value can also understand where the fault point is. Therefore, it is necessary to learn to analyze.

Tail signature:

Project scope.The above detailed introduction, I believe everyone has a certain understanding of elevator selection, so that they can have a clear goal when choosing, and then choose the elevator that is suitable for customers.

After 5000 hours of operation of the elevator, it may harm people and objects!


Winnie snowHydraulic flipping integrated unloading platformIntroduction to the selection skills of homework methods



Everyone knows that construction elevators are used during the construction process because they have stability, are sturdy and reliable during use, and are widely used in the field of high-rise buildings due to their small size and other advantages.

Production department.Check the hydraulic oil quality and level. When the lifting platform is raised to a high position, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.

For lifting platforms without manned protection, it is strictly prohibited to carry people during use. At the same time attention should be paid during use to prevent damage to hands, feet, and clothing.

Secondly, the maintenance of the guide rail type hydraulic lifting platform is also very simple, using oil cylinders and chain transmission, with very few moving components, so the maintenance workload is not very high. Moreover, this type of lifting cargo elevator has a very compact structure and uses fewer bearings, resulting in a longer service life.

Winnie snow.Function: Convenient unloading, strong stability, and low maintenance cost. Suitable for various vehicles on loading and unloading sites and places with relatively busy traffic. Loading and unloading platforms, lifting platforms, and unloading platforms: anti slip devices: This device is welded from steel plates and can effectively achieve anti slip function, which is reliable.

If there are problems inside the elevator and electrical professionals are present any components of the hydraulic system should be disassembled and repaired in a completely depressurized condition.

Regularly check whether the operation of each mechanism is normal and whether there is any noise. If any faults are found, they must be promptly eliminated.