MkulangaOutline dimensions of 2500kVA dry type transformerImportance in cranes

announcer:hp122HP117294921 release time:2024-05-03 11:35:25

Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, causing the ignition of the casing, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.

Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.

Mkulanga.How to maintain dry-type transformer?

What is the important role of power transformer

.Connection group structure of dry-type transformer

In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.


MkulangaOutline dimensions of 2500kVA dry type transformerImportance in cranes



After sampling,MkulangaTransformer 2000 KVA, porcelain, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.

Installation works.The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

For no-load impulse closing of transformer,MkulangaWhat is the price of 1000 KVA transformer, pay attention to the following matters:

If the oil immersed transformer is burned by the cover of the transformer, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.


MkulangaOutline dimensions of 2500kVA dry type transformerImportance in cranes



The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.

Supply chain quality management.For the leakage that has already occurred, find the leakage point first which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.

Step up process of dry-type transformer?

In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer,MkulangaOn load voltage regulating power transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.

Mkulanga.The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.

Naturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire please be rational to make the oil immersed transformer safer and more efficient.

Oil immersed transformer company