KessleyScissor fork electric lifting platformOperating procedures

announcer:hp935HP175192871 release time:2024-04-24 13:16:54

KessleyMobile electric elevator, with a spacing of 200mm.

Kessley.Construction electric elevators must be equipped with lifting cages and reusable buffers effective protective measures should be taken.

Double layer steel mesh: The diameter of the steel bars is 12mm, and comply with regulatory requirements.

Before operating the construction electric elevator,KessleyElectric elevator platform, routine inspections should be carried out according to regulations and inspection records should be filled out.

.The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area,KessleyManned electric elevator, improving the utilization rate of the wellbore area.


KessleyScissor fork electric lifting platformOperating procedures



The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

Attention should be paid to the occurrence of oil leakage on the aluminum alloy lifting platform to avoid secondary damage caused by a shortage of hydraulic oil. Overloading work is prohibited during use

The scaffolding of the parking platform should be laid tightly and firmly.

Quality documents.Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.

Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.

Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.


KessleyScissor fork electric lifting platformOperating procedures



Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

Process inspection.In addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between 1m and 2m. And there should be at least protective railings, a half height middle crossbar, and a toe board at least 150mm above the ground.

Folding arm electric elevators are mostly driven by hydraulic means, and the source of power for the hydraulic system is hydraulic oil. Only when the hydraulic oil quantity is sufficient and the oil quality is high, can the folding arm electric elevator provide greater torque output, how can we determine whether the newly added hydraulic oil quantity is sufficient? What is the hydraulic oil quantity standard?

Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

Kessley.The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

When the wall bracket adopts non matching standard products, design calculations should be carried out.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.