CologneElevator electric 6 metersWhat to know about

announcer:hp935HP175192871 release time:2024-04-24 10:31:24

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit,Cologne10 meter electric lifting platform, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Cologne.In addition to fixed modes, this type of lifting device is a combination of lifting equipment and car mounted systems. It is very flexible to move, and of course, it is better to use it. For example, there are such lifting devices in airports, and car stations or sports stadiums may also be equipped with such devices, as they can be moved, So the scope of the operation is not limited to a specific place, but can be used wherever lifting operations are required. For example, when installing outdoor advertisements, some advertisements are relatively high in height. At this time, mobile lifting equipment can be used to transport billboards or staff to the designated height for work. This type of equipment can also be divided into two types based on the driving mode: hydraulic lifting and electric lifting. The so-called hydraulic lifting is the use of hydraulic oil to drive and reach a specified height. The electric mode is driven by a motor or teeth to lift to a certain height. However, currently, hydraulic lifting platforms are more widely used.

The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations which can also be selected according to customer requirements to meet customer ideal requirements.

.Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.


CologneElevator electric 6 metersWhat to know about



Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

The installation position of the lower limit switch. The installation position of the lower limit switch should ensure that the contact plate triggers the switch when the rated load of the suspension cage decreases, causing the suspension cage to stop. At this time, the contact plate should also be close to the triggering of the lower limit switch

The advantages and disadvantages of several commonly used electric lifting mechanisms are as follows: hydraulic electric lifting mechanisms: using hydraulic technology, smooth lifting and low noise.

Range.Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

Advantages of electric elevator rotary valve: Simplify the installation of electric elevator pipelines; The operation is more convenient, and the valve can be opened and closed at any time; The installation of a rotary valve reduces the friction of the sealing components; Compact structure small size, and space saving; Increased the service life of electric elevator pipelines and solved the problem of easy oil leakage.

Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.


CologneElevator electric 6 metersWhat to know about



Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

Where can I find it?.The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.

Precautions during operation: Mechanical operations should be gentle and smooth, and mechanical operations should be avoided, otherwise impact loads will inevitably occur, causing frequent mechanical failures and greatly shortening the service life. Generated during homework

Construction electric elevators outside the lightning protection range

Cologne.When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.

Low power consumption: When the hydraulic guide rail lifting platform descends,CologneElectric guide rail elevator, it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.