Hu GewenNew electric elevatorWhat are the main categories

announcer:hp935HP175192871 release time:2024-04-20 11:45:19

Acceptance: Concrete strength grade C30 strength testing report.

When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, but safety should be maintained.

Hu Gewen.The shutdown device (emergency stop switch) should be non automatic reset type.

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, sticky, or has foreign objects such as gravel, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

.Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position


Hu GewenNew electric elevatorWhat are the main categories



Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

The inner bearing of the roller in the device is in good condition,Hu GewenElectric rope climbing machine elevator,Hu Gewen5 meter electric spiral elevator, and a complete grease film surface is maintained between the curved surface of the roller and the main chord of the aluminum alloy electric elevator. A good grease film surface can reduce wear and noise

High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.

Workshop cost.The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

Setting requirements: The installation and dismantling workers, electricians and other operators of construction electric elevators should have special construction operations.


Hu GewenNew electric elevatorWhat are the main categories



Before installation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

production costs.When the wall bracket adopts non matching standard products, design calculations should be carried out.

Afterwards it should be scrapped.

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

Hu Gewen.There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve,Hu GewenInstallation of electric elevators for fire protection, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.

The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.