HejinFour meter electric elevatorHow to choose

announcer:hp935HP175192871 release time:2024-04-19 11:21:03

Work is essential and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, etc.

Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

Hejin.Afterwards, it should be scrapped.

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, and the valve can be opened and closed at any time; The installation of a rotary valve reduces the friction of the sealing components; Compact structure, small size, and space saving; Increased the service life of electric elevator pipelines and solved the problem of easy oil leakage.

Implementing multiple shifts of homework should fill in and submit records according to regulations.


HejinFour meter electric elevatorHow to choose



Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.

Platform.

When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts,HejinGuide rail electric elevator, should comply with the provisions of Table 4 of GB 23821-2009.

Fair price.Monthly maintenance and inspection of hydraulic lifting platform rollers, oil cylinder pin shafts and bearings, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened whether the sealing rings are damaged or ineffective, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.


HejinFour meter electric elevatorHow to choose



Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

Home page recommendation.According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater,HejinElectric basket elevator, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage, an intermediate stage, a T-shaped stage, or a hall.

Alarm devices can be divided into fixed and mobile platforms, rail type and scissor type (curved arm type) to distinguish between overload or equipment malfunction. Fixed types include: scissor lift cargo elevator, chain electric elevator, and installation

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

Hejin.Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements,HejinElectric scissor type lifting platform, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, but safety should be maintained.