FenyangLarge electric elevatorWhat is the application principle of

announcer:hp935HP175192871 release time:2024-04-18 13:16:04

The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

Electric elevators used in various places.

Fenyang.Steel wire rope construction electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the lifting cage until it is approved by a professional

The counterweight guide rail should meet the specification requirements.

.Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

After the electric elevator passes the inspection the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.


FenyangLarge electric elevatorWhat is the application principle of



Setting requirements: The installation and dismantling workers, electricians and other operators of construction electric elevators should have special construction operations.

Savings, rate of increase and decrease. To ensure safe and reliable braking and prevent accidents, a hydraulic control one-way valve, also known as a hydraulic lock, is added to prevent hydraulic pipelines from exploding and self locking safely. Installed overloaded voice control alarm

When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above,Fenyang3 meter electric elevator, effective protective measures should be taken.

Marketing Department.It is reported that a fixed electric elevator has good lifting stability and can only be used for fixed operations, making high-altitude operations easier

Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance,FenyangSmall and simple electric elevator, which should cover the opening with its full width, and should not open towards the lifting passage.


FenyangLarge electric elevatorWhat is the application principle of



For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.

Installation requirements.The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, making high-altitude operations easier