peitaihoElectric scissor type lifting platformAutomatic sealing performance characteristics

announcer:hp935HP175192871 release time:2024-04-18 12:50:21

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

Setting requirements: The wall bracket should use the manufacturer's matching standard products.

peitaiho.The counterweight steel wire rope should be equipped with an anti loosening device that is sensitive and reliable.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

.Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.


peitaihoElectric scissor type lifting platformAutomatic sealing performance characteristics



Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean,peitaihoMicro electric elevator, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space and ensure that the lifting platform can be lifted to the rated lifting height.

The shutdown device (emergency stop switch) should be non automatic reset type.

To ensure safe and reliable braking of the lifting platform and prevent accidents, a hydraulic control one-way valve, also known as a hydraulic lock,peitaiho6m electric elevator, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.

Latest consultation.Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

The verticality of the guide rail frame should meet the requirements of the specifications.

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.


peitaihoElectric scissor type lifting platformAutomatic sealing performance characteristics



Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

Excellent service.Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

Before each shift of work, those that have undergone national safety certification will not have significant safety issues. The main problem is that after using the electric elevator for a period of time, mechanical components may fall off or be damaged due to various factors. This problem depends on regular inspection and maintenance of the machinery

Construction electric elevators outside the lightning protection range

The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations which can also be selected according to customer requirements to meet customer ideal requirements.