AntwerpWarehouse electric elevatorWhat are the protection methods

announcer:hp935HP175192871 release time:2024-04-17 11:48:08

When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts should comply with the provisions of Table 4 of GB 23821-2009.

The safety distance between the outer edge of the upper part of the landing door and the moving parts of the electric elevator during normal operation should not be less than 0.75m; If the rated speed is not greater than 0.7m/s, the safety distance can be 0.40m.

Antwerp.There is a certain itinerary.

The setting of the cable guide frame should comply with the user manual and regulatory requirements.

.Every theater is a public place with a large number of people,AntwerpElectric elevator mobile type, in order to prevent accidents caused by the crushing of electric elevators or improper control by drivers. Electric elevators should be equipped with the following necessary safety devices to ensure that the car of the electric elevator stops rising or falling in a timely manner.

During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements,AntwerpMobile electric elevator, auxiliary lifting platforms are often arranged in front, back, left,AntwerpElectric lifting scissor lift, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, ensuring the safety of the cast members.


AntwerpWarehouse electric elevatorWhat are the protection methods



Acceptance: Concrete strength grade C30, strength testing report.

The cargo is 0.5m.

Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

Inspection environment.Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Acceptance: Concrete strength grade C30, strength testing report.

Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.


AntwerpWarehouse electric elevatorWhat are the protection methods



During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

Variable cost.Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.

When a suspension cage with a rated load capacity acts on the buffer at a speed greater than the rated speed of 0.2m/s, the average deceleration of the suspension cage should not exceed 1g, and the time when the peak deceleration exceeds 5g should not exceed

Flat screw mechanical electric lifting mechanism: The lifting platform of this structure has the advantages of small civil engineering coordination, shallow foundation pit required, large stroke, stable operation, low noise, accurate positioning, and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table, it can be stopped arbitrarily within the range of travel.

Antwerp.Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Construction electric elevators outside the lightning protection range