HardenbachThree meter electric elevatorChallenge your own weaknesses

announcer:hp935HP175192871 release time:2024-04-17 09:26:47

The function of the lifting platform in a theater is roughly as follows: the main lifting platform arranged in the main performance area of the stage is mainly used to quickly change the scenery. Typically, with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern,HardenbachThree wheel electric elevator, the lifting platform, side car platform, and rear car turntable perform a rapid transformation of the entire or partial scene. This arrangement allows for rapid switching of three full sets.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

Hardenbach.Check the starter potential when the lifting table is not raised or the voltage is too low when the motor load is working. Voltage hydraulic range allowed&

During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.

.Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.


HardenbachThree meter electric elevatorChallenge your own weaknesses



Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace,HardenbachElectric belt elevator, Tower, and the validity period should not exceed 1 year. Anti fall safety devices have been manufactured for five years

The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

Product range.When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.

Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods,HardenbachElectric folding elevator, the operating failure rate can be reduced to a low level.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.


HardenbachThree meter electric elevatorChallenge your own weaknesses



The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.

Good reputation.Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

How to determine the sufficient amount of clean oil for the hydraulic station of an electric elevator? Why cannot water be used to flush the hydraulic station of an electric elevator?

Remind customers that there are still many areas to pay attention to when maintaining and maintaining the lifting platform. We also hope that customers and friends can pay more attention when using it to ensure the safety of personnel and property, regularly maintain and extend its service life, and create greater benefits for the enterprise. What is the matching degree of electric elevators? Everyone has always been confused. In short the matching degree of electric elevators is how the height of the electric elevator can be combined with the operating height. Electric elevators are not used frequently, so we must make it clear based on the actual operating height and actual load capacity when using electric elevators. If the frequency is too high, We suggest considering purchasing a guide rail electric elevator or a scissor fork electric elevator. The scissor fork electric elevator can achieve a maximum load capacity of 100 tons, which effectively solves the problem of load capacity. If the frequency of use is too high and the height is relatively high, we recommend using a guide rail electric elevator. This type of electric elevator is not easy to malfunction under high-frequency operation, By solving the load capacity and frequency of use, the matching problem of electric elevators is effectively solved. Concept of electric elevator rotary valve: The electric elevator rotary valve is a type of valve that quickly opens and closes, and the rotary valve can reduce oil pipeline channels and optimize line settings.

Hardenbach.Safety performance: Electric elevators not only have the safety device of traditional traction elevators, but also have an overflow valve to prevent excessive system pressure during upward movement

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures