OrleansElevator platform electricSituation Analysis

announcer:hp935HP175192871 release time:2024-04-16 11:40:35

When the wall bracket cannot meet the requirements of the construction site, using side mounted oil cylinders, stable operation, noise free,OrleansTricycle electric elevator,OrleansMicro electric hoist, easy maintenance, and longer service life.

Orleans.The noise of aluminum alloy electric elevators during operation is relatively low. If the noise is high, it is abnormal. Therefore, it is necessary to do a good job in troubleshooting, find the cause in a timely manner,Orleans500kg electric elevator, reduce noise pollution, and reduce dangerous accidents

When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.

.Installation and dismantling personnel and drivers should hold certificates to work.

Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.


OrleansElevator platform electricSituation Analysis



Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness strength, stability, etc., and the production should meet the design requirements.

Construction electric elevators should be equipped with emergency stop switches and comply with regulatory requirements.

Electric elevators used in various places.

property right.When the wall bracket cannot meet the requirements of the construction site, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.

Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.


OrleansElevator platform electricSituation Analysis



The hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).

how much.Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

Correct use can also greatly improve work efficiency. So how should it be used?

During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

Orleans.During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.