LeipzigImported hydraulic lifting platformHow to choose the medium for cooling

announcer:hp695HP135175170 release time:2024-04-13 12:57:18

Familiarity with the usage process and without a doubt, this is the first thing to understand. There are two ways to understand it: first, carefully read the user manual provided by the manufacturer when the hydraulic lifting platform leaves the factory; The second is the equipment that needs to be installed. A professional installation technician will be dispatched to install the hydraulic lifting platform. After the installation is completed, relevant users will be trained on the operating process and safety precautions of the hydraulic lifting platform, and some maintenance matters in the future will also be explained; What should be paid attention to during the running-in period when using hydraulic lifting platforms? Check the wear of components. For newly processed and assembled components, there may be subtle deviations in shape and size that require a period of time for running-in. Therefore, during the running-in period, it is necessary to pay attention to whether there is any rapid wear. If there is any, the manufacturer of the hydraulic lifting platform should handle it in a timely manner to avoid equipment failure; Work between the pins and bearings to ensure that they are not worn, and add some engine oil or grease appropriately; Confirm if there is any noise during the running-in period. If it is found that the hydraulic lifting platform is noisy during operation, there is no need to worry in the early stage. If there are no major problems, run it several times more. After the running-in, the noise will naturally disappear. However, if there is noise for a long time and no signs of fading, please make sure to promptly produce it and solve the problem; Regularly check if the components are loose. Before use, check if there are any signs of looseness in screws, nuts, retaining rings, oil pipe joints, etc. If there are any please reinforce or replace them in a timely manner to avoid accidents.

Familiarity with the usage process and without a doubt, this is the first thing to understand. There are two ways to understand it: first, carefully read the user manual provided by the manufacturer when the hydraulic lifting platform leaves the factory; The second is the equipment that needs to be installed. A professional installation technician will be dispatched to install the hydraulic lifting platform. After the installation is completed, relevant users will be trained on the operating process and safety precautions of the hydraulic lifting platform, and some maintenance matters in the future will also be explained; What should be paid attention to during the running-in period when using hydraulic lifting platforms? Check the wear of components. For newly processed and assembled components, there may be subtle deviations in shape and size that require a period of time for running-in. Therefore, during the running-in period, it is necessary to pay attention to whether there is any rapid wear. If there is any, the manufacturer of the hydraulic lifting platform should handle it in a timely manner to avoid equipment failure; Work between the pins and bearings to ensure that they are not worn, there is no need to worry in the early stage. If there are no major problems, run it several times more. After the running-in, the noise will naturally disappear. However, if there is noise for a long time and no signs of fading, please make sure to promptly produce it and solve the problem; Regularly check if the components are loose. Before use, check if there are any signs of looseness in screws, nuts, retaining rings, oil pipe joints, please reinforce or replace them in a timely manner to avoid accidents.

Leipzig.Whether it is a large machinery with complex structure or a small to medium-sized equipment with simple structure the maintenance work scope is mainly focused on cleaning, fastening, and corrosion prevention, commonly referred to as" Cross homework”.

When working at heights exceeding 1.5 meters, safety nets or safety belts must be used. Specializing in the production of scissor type elevators, a 20 year old brand with competitive prices and guaranteed quality!

.The daily maintenance of guide rail type lifting equipment should pay attention to regular inspection and maintenance, eliminate hidden dangers, eliminate faults, and achieve these benefits for improving work efficiency,Leipzigfork lifter, extending equipment service life, and ensuring the safety performance of the elevator.

The size of the oil cylinder should be minimized as much as possible while meeting the design requirements. The smaller the size of the oil cylinder, the faster the lifting speed.

Replace with new oil and do not intermittently use old oil otherwise the moving parts in the system will accelerate wear.


LeipzigImported hydraulic lifting platformHow to choose the medium for cooling



Carefully prepare a special construction plan for installation and provide technical disclosure to the installation personnel. I have been engaged in various types of scissor lift manufacturers and other materials for many years, and operate with integrity. Welcome to call!

Whether it is a large machinery with complex structure or a small to medium-sized equipment with simple structure,LeipzigGuide rail hydraulic lifting platform, the maintenance work scope is mainly focused on cleaning, adjustment, fastening, and corrosion prevention, commonly referred to as" Cross homework”.

The size of the oil cylinder should be minimized as much as possible while meeting the design requirements. The smaller the size of the oil cylinder, the faster the lifting speed.

technical service.Drain and discard the hydraulic oil from the hydraulic lifting cargo elevator. For the outdoor guide rail elevator, tighten the joint and remove the oil filter. After cleaning, clean it with compressed air and then return it to the oil tank and connect the pipeline.

Hydraulic oil should be kept clean and replaced every 6 months; When repairing, maintaining, and cleaning the elevator, be sure to support the support rod.

Regular refueling is necessary for maintenance of the elevator: During the use of the elevator, due to the large load, there is also significant friction between various components, especially the elevator chain and elevator shaft pins. It is necessary to ensure that an appropriate amount of oil is added before each use to ensure flexibility and non jamming during operation. If the elevator is in operation and once&quo; appears; Squeak and Squeak&# quo; The friction sound can be basically determined to be due to a lack of oil in the elevator. It is necessary to immediately stop working and investigate the cause, and cannot forcibly operate, which can easily cause unforeseeable hidden dangers. Summary: Regular refueling is not allowed when maintaining the elevator.


LeipzigImported hydraulic lifting platformHow to choose the medium for cooling



The guide rail type cargo elevator has been inspected and debugged before leaving the factory, only the power supply needs to be connected, and the hydraulic and electrical systems do not need to be adjusted.

average method.The sinking of a cargo elevator is a phenomenon where the table surface drops due to gravity after a certain period of time when it rises to a designated position. Of course, this problem is definitely abnormal. So how can we solve it? The first step is to identify the cause. Below, the editor summarizes the ultimate solution.

How do elevator manufacturers maintain and maintain construction elevators? In order to accurately implement the equipment maintenance system,LeipzigHydraulic lifting platform truck, it is necessary to establish a mechanical management responsibility system; It is necessary to develop maintenance procedures for different models; Corresponding maintenance institutions must be implemented; It is necessary to handle the relationship between maintenance and production, so as not to affect production or equipment maintenance.

According to Beijing regulations, the arrival time is within 30 minutes.

Leipzig.When encountering overheating in the hydraulic elevator motor it is necessary to stop it in a timely manner, eliminate the fault, and continue running. The motor bearings should be in good condition.

Any product always has a break-in period when it is first used, so what precautions should we pay attention to during the break-in period when using a hydraulic lifting platform? Today, the editor will share this topic with everyone.

When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, slopes, or cliffs, guardrails or safety nets should be installed on the side facing the air