GedlerElectric bed elevatorThe uniqueness of the state

announcer:hp935HP175192871 release time:2024-04-08 11:25:44

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm and the top layer is not affected. It can be customized according to the location and environment.

The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

Gedler.Stop the suspension cage.

Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Tower, Pavilion; Ideal props.

.When the foundation is set on the roof or floor structure,GedlerElectric cargo elevator,GedlerElectric elevator battery, the bearing capacity of its supporting structure should be checked.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.


GedlerElectric bed elevatorThe uniqueness of the state



Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.

The suspension cage movement can only be resumed after operator operation.

In order to meet the needs of contemporary audiences and achieve perfect effects in addition to lighting and sound, stage machinery is particularly important on the stage. On the stage, there are suspension rods, suspension points, lighting bridges, lighting suspension cages, and fire curtains. Under the stage, there are lifting platforms, car platforms, turntables and lifting orchestras. Some lifting platforms are equipped with turntables, or there are lifting platforms in the turntables. Various types of lifting platforms are equipped in professional opera houses, dance theaters, drama theaters, and many internationally renowned music halls. It has the functions of quickly changing scenery, meeting the needs of stage craft layout, meeting the needs of stage design and choreographers, creating special atmosphere and effects, and changing the stage form according to the needs of the performance.

High quality brand.The net height of the landing door opening should not be less than 8m, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed 35mm, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.

Protective measures should comply with regulatory requirements.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.


GedlerElectric bed elevatorThe uniqueness of the state



The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

How much does it cost?.Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Requirements for the operation platform of the construction lowering machine and the setting of the brake reset emergency stop switch: The shutdown device (emergency stop switch) should be able to stop or maintain the electric elevator (including the power driven door) in a non working state

Installation and dismantling personnel and drivers should hold certificates to work.

Gedler.The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.

Stage equipment safety door. To prevent personnel from extending their heads, hands, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, its cabin should be full of doors,GedlerElectric fork lift table, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.

Especially suitable for steel structured factories