DenverDouble shear hydraulic lifting platformTechnological innovation ecosystem

announcer:hp695HP135175170 release time:2024-04-06 11:11:19

The daily maintenance of guide rail type cargo elevators should ensure that the transmission position where the grease nipple is located needs to be lubricated twice a month. For areas where grease cannot be added, it is necessary to clear the oil circuit or replace the grease nipple until butter can be added. Otherwise, it is prohibited to use the equipment.

When working in a hot environment, pay attention to heat dissipation.

Denver.The indicator light is on, press the up button, the motor rotates but the lifting table does not rise. Check≥ Phase power supply, after the power supply is reversed, the motor reverses, and only needs to correct the power supply.

During use,DenverMast type aluminum alloy hydraulic lifting platform, the elevator should be placed on a solid and flat ground to prevent tipping during operation. Press&quo; Rising; Or&quo; Descending; Press the button to frequently check and maintain the various components of the elevator when lifting the workbench. If the workbench does not move, it should be immediately stopped for inspection. When the working pressure of the electric elevator is found to be too high or the sound is abnormal it should be immediately shut down for inspection to avoid serious mechanical damage; Regularly check the working status of the shaft pin every month. If any loose shaft pin or screw is found, it must be locked tightly to prevent accidents caused by the shaft pin falling off.

.In the construction elevator, the switch box also has leakage protection equipment, and its wires and cables have good insulation without leakage. The metal passing through the wires is not rusted, and its damage is close to zero. His steel wire rope should comply with the corresponding configuration requirements, without any issues of strand breakage or shrinkage, and of course, the number of broken wires should not exceed the corresponding standards. His pulley movement is very flexible.

Regularly check all wires and cables for damage. Timely bandage and replace damaged parts. Various scissor lift manufacturers have formal qualifications. Welcome to inquire by phone and sincerely invite cooperation!

Regularly check all wires and cables for damage. Timely bandage and replace damaged parts. Various scissor lift manufacturers have formal qualifications. Welcome to inquire by phone and sincerely invite cooperation!


DenverDouble shear hydraulic lifting platformTechnological innovation ecosystem



High altitude work is now also very common, and elevators are also highly demanded by the market. Many high-rise transportation tasks are completed by elevators, with high efficiency and reassuring safety. However, attention should also be paid to the installation of the elevator, otherwise there may be problems, and no one wants to see such a situation happen. What are the installation precautions for elevators?

The set pressure of the elevator price regulating valve is insufficient; The solution is to adjust the pressure valve. Professional scissor lift manufacturers have strict testing, quality assurance, and promotional activities are underway. Welcome to consult

The daily maintenance of guide rail type lifting equipment should pay attention to regular inspection and maintenance, eliminate hidden dangers, eliminate faults, extending equipment service life, and ensuring the safety performance of the elevator.

Finance Department.The application scenarios of mobile elevators may require several or even dozens of passenger elevators in some office buildings and hospitals. In order to increase the speed, efficiency and usable area of electric elevators, most high-rise buildings will divide electric elevators into arrays, and make different adjustments and scheduling based on the usage mode of different floors at different times.

Avoid, especially during storage. Store in a cool and dry place, intermediate shafts, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings.


DenverDouble shear hydraulic lifting platformTechnological innovation ecosystem



The lifting platform has been inspected and debugged before leaving the factory, and all technical indicators meet the design requirements. When in use, only the power supply needs to be connected, and the hydraulic and electrical systems basically do not need to be adjusted.

assets.Before installing the elevator bearings, do not open the packaging too early. This can easily lead to premature bearing contamination, which can lead to premature bearing damage. Additionally, ensure that the installation environment is clean and do not bring iron filings, dust, and other objects into the bearings. Even small dust particles can cause premature bearing damage, Prolonged use can also affect the running in between bearings, leading to a decrease in the lifespan of the elevator.

Check the starter potential when the lifting table is not raised or the voltage is too low when the motor load is working. Voltage hydraulic range allowed± 10% of the motor does not rotate. Check the motor and circuit. The motor can be reversed to arbitrarily change the two phases in the three-phase line.

Regular inspection and maintenance,DenverCylinder mounted hydraulic lifting platform, eliminating hidden dangers, and troubleshooting are beneficial for improving work efficiency, extending equipment service life and ensuring the safety performance of elevators.

Denver.The inconsistent production dimensions of the hydraulic lifting platform support rods are a quality defect of the lifting platform equipment itself. It is recommended that the manufacturer replace them, as the probability of this situation occurring is relatively low.

The sinking of a cargo elevator is a phenomenon where the table surface drops due to gravity after a certain period of time when it rises to a designated position. Of course, this problem is definitely abnormal. So how can we solve it? The first step is to identify the cause. Below,Denver10 meter lifting hydraulic platform, the editor summarizes the ultimate solution.

The power unit adjustment, whether it is a scissor type lifting platform or a guide rail type lifting cargo elevator, is composed of the power unit and the oil cylinder. The power unit has four outlets during production, the longer the lifting time. Therefore, during installation, the length of the oil pipe should be minimized as much as possible within the allowable range of the design; On the basis of adjusting the power unit the size of the oil pipeline can also be adjusted, and corresponding adjustments can be made while ensuring that the equipment meets normal demand and safety.