GottingenElectric banner elevatorHow to buy commonly used

announcer:hp935HP175192871 release time:2024-03-25 11:26:18

Acceptance: Concrete strength grade C30, strength testing report.

Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

Gottingen.Construction electric elevators should be equipped with lower limit switches that are sensitive and reliable.

Acceptance: Concrete strength grade C30, strength testing report.

.Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

Use floor doors and cage door devices on construction sites where conditions permit.

Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.


GottingenElectric banner elevatorHow to buy commonly used



The L distance depends on the selected wall mount model.

The magnetic directional valve returns to the fuel tank. To ensure stable landing of heavy objects and safe and reliable braking,Gottingen2 meter electric lifting platform, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the landing speed does not change due to heavy objects. It is adjusted by the saving valve

Setting requirements: The installation and dismantling workers,GottingenWarehouse electric elevator, electricians, and other operators of construction electric elevators should have special construction operations.

total cost.The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.


GottingenElectric banner elevatorHow to buy commonly used



According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, an island stage, an intermediate stage, a T-shaped stage, or a hall.

Pursuit of excellence.Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.

The water cooling of hydraulic stations is generally tubular water cooling. The selection is based on the heat load to calculate the heat exchange area,GottingenGuide rail electric elevator, while the air-cooled electric elevator uses an air cooler to calculate the heat exchange capacity based on the heat load. Then, the selection calculation is carried out under the condition of satisfying the flow rate. So, these two types of cooling are different and have significant differences.

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

Gottingen.Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, stability, etc., and the production should meet the design requirements.

Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.