SentesElectric small elevatorUse in cryogenic media

announcer:hp935HP175192871 release time:2024-03-25 11:02:09

Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.

During the use period,SentesElectric small elevator, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

Sentes.How to determine the sufficient amount of clean oil for the hydraulic station of an electric elevator? Why cannot water be used to flush the hydraulic station of an electric elevator?

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

.The landing door should meet the requirements of the specifications and achieve standardization.

Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.


SentesElectric small elevatorUse in cryogenic media



The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

When charging, it is necessary to charge it in a timely manner. When the equipment is used for about 2 months (according to the actual frequency of use), it is necessary to add grease to the rotating parts once; Regularly inspect the working status of the pin shaft of the fully self-propelled electric elevator every month, and if any pin shaft is found

To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, left, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, ensuring the safety of the cast members.

Inspection environment.Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

The use of a lifting platform as a tool for storing performance blankets,SentesTricycle electric elevator, soft scenery,SentesElectric simple elevator, etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, soft scenery, etc.

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.


SentesElectric small elevatorUse in cryogenic media



Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

Work courses.The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

The water cooling of hydraulic stations is generally tubular water cooling. The selection is based on the heat load to calculate the heat exchange area, while the air-cooled electric elevator uses an air cooler to calculate the heat exchange capacity based on the heat load. Then, these two types of cooling are different and have significant differences.

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

Sentes.Acceptance: Concrete strength grade C30 strength testing report.

The net height of the landing door opening should not be less than 8m, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed 35mm the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.