Nanjing500 KVA dry type transformerWhat are the tools and quality requirements of the production line?

announcer:hp122HP117294921 release time:2024-03-25 10:12:54

Dry type transformer factory

Before no-load impulse closing, the transformer shall be placed for 24h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

Nanjing.The domestic transformer market is slow

What is the important role of power transformer

.Naturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.

During no-load test run the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.

High voltage fuse of transformer breaks one phase;


Nanjing500 KVA dry type transformerWhat are the tools and quality requirements of the production line?



Therefore, in the installation process of substation equipment, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.

First of all, although dry-type transformer has strong moisture resistance, it is generally open structure or very susceptible to moisture, especially the insulation level of dry-type transformer manufactured in China is low (lower flame retardant grade) Therefore, the dry-type transformer can obtain high stability only when the air humidity is below 70%. The dry-type transformer shall also be prevented from stopping operation for a long time to prevent serious damp. When the grounding resistance value is less than 1000 / V (operating voltage), it indicates that the transformer is seriously damp, and the trial operation shall be terminated.

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

safety requirements .The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

When sampling in bulk gasoline barrels, samples shall be selected according to 5% of the number of gasoline barrels, but not less than 2 barrels. When sampling in batches of small and medium-sized pails or bottles,NanjingDelivery test report of dry-type transformer, samples shall be taken according to 2% of the total number of barrels (bottles).

Difference between dry-type transformer and oil immersed transformer:


Nanjing500 KVA dry type transformerWhat are the tools and quality requirements of the production line?



It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain,NanjingPrice of 800 KVA dry type box transformer,NanjingOil immersed single phase transformer, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.

quality index.How much is the power transformer

The person in charge of a transformer manufacturer said that because of the hazards of raw materials and other factors, the market has not yet fully operated.

Dry type transformer manufacturer

Nanjing.Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.

Power transformer

On load commissioning: